Harbor dock · Tide-ready edits · Free shipping over $85
Harbor dock · Tri-pane berth
Dock frame Minimal four
4.6

Marathon Motors 2 HP, Severe Duty Motor, 3-Phase, 1170 Nameplate RPM, 230/460 Voltage, 184T Frame - 184TTTS6582 Frame Material-Steel White Epoxy 2-speed motors are for use

SKU 1397359669
USD506.67 USD547.67

Pay in 4 interest-free payments of $126.67 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Nov 3 - Nov 8

Dock notes

Duotone berth — harbor brief on the left, coral-folded cargo sheet on the right.

Cargo sheet
Description

Marathon Motors 2 HP, Severe Duty Motor, 3 Phase, 1170 Nameplate RPM, 230 460 Voltage, 184T Frame 184TTTS6582 Frame Material Steel White Epoxy 2 speed motors are for use 2 speed motors are for use in diminishing torque air moving applications such as belt or direct drive fans and blowers Nameplate RPM: 1180 The cast iron frame offers excellent resistance to wear and holds its shape after impact and is suitable for use in industrial environments where 3 phase power is available

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

Frequently Asked Questions for Marathon Motors 2 HP, Severe Duty Motor, 3-Phase, 1170 Nameplate RPM, 230/460 Voltage, 184T Frame - 184TTTS6582 Frame Material-Steel White Epoxy 2-speed motors are for use

What should I do if I may have placed the same order twice?

Avoid making another attempt while the possible duplication is unresolved. Ask the seller to clarify any mismatch between transaction information and order entries.

What should I check in an order confirmation?

Confirm that the order identifies the product you intended to purchase. Review whether a remaining action has a stated deadline.

What should I clarify when I need a purchase by a particular date?

Check whether changing an option would affect the agreed timeframe. Review applicable terms in case the required date cannot be met.

Discover

Random picks

You may also like

Recommended

recommand products